可以不可以动漫免费观看,久久精品中文字幕一区,国产午夜精品久久,日韩欧美天堂,久久99精品国产.久久久久,久久国产精,国产91专区

Strengthening

Location:Home>Strengthening

National Energy Shuangjiangkou Hydropower Station Intelligent Monitoring Project
2024-07-04 15:11:15

11.jpg

222.jpg

Shuangjiangkou Hydropower Station is an upstream control reservoir project for hydroelectric cascade development in the Dadu River Basin, and one of the key projects in the development of cascade power stations in the Dadu River Basin. The earth-core wall rockfill dam is 314m high, ranking first in the world of its kind. In the feasibility study stage, it is recommended that the normal storage level of the reservoir is 2500 m, the dead water level is 2330 m, the maximum dam height is 312 m, the storage capacity below the normal storage level is 3.115 billion cubic meters, and the adjusted storage capacity is 2.152 billion cubic meters. It is an annual regulating reservoir. Increase the downstream cascade power station's dry season electricity by 6.6 billion kwh and increase the guaranteed output of 1.758 million kwh.

In this project, 3 self-sensing anchor rods and 3 self-sensing anchor cables are respectively arranged at the F3 fault of the cavern spill tunnel, the lamprophyre vein of the auxiliary powerhouse, and the 3# diversion tunnel entrance slope to strengthen the three sections Surrounding rock health monitoring capabilities.


金沙县| 烟台市| 焦作市| 比如县| 太康县| 汝阳县| 包头市| 根河市| 乐平市| 田东县| 依兰县| 凤翔县| 永州市| 乐陵市| 普格县| 周至县| 高青县| 台中县| 阿瓦提县| 东港市| 新龙县| 册亨县| 浮山县| 武威市| 乃东县| 大姚县| 密山市| 土默特右旗| 怀仁县| 汨罗市| 中江县| 新余市| 永川市| 齐齐哈尔市| 无锡市| 隆化县| 平遥县| 桂阳县| 合水县| 苏尼特左旗| 中阳县|